Sheinton FlexiArch - 23 September 2010
Saturday 22nd April 2000
Macrete Ireland Ltd supplied a Flexi Arch bridge system for installation on the Cressage to Sheinton Road near Shrewsbury in Shropshire.
The bridge details are as follows
Span = 13.7m
Rise = 2.70m
Width = 6.00m
Contractor: Dew Construction
Client: Shropshire Council