Kildare FlexiArch Installation - 23 June 2008
Friday 14th April 2000
A selection of photographs showing the installation of a FlexiArch bridge at Cellbridge, Co. Kildare. The bridge was completed on behalf of Barina Construction. The bridge was assembled in 1 day. Backfilling was completed by the contractor.
The bridge has a span of 5.20m, a rise of 1.30m and the width of the bridge was 12.00m.