June 2013
Ashton Bridge Flexi Arch Installation
18 June 2013
Fourteen Macrete Flexi Arch units were slid into place beneath an existing road bridge dating from 1935, in Tameside Greater Manchester, in the first application of the Macrete Flexi Arch technology as an existing bridge reinforcement.
Heathrow Beams
18 June 2013
Macrete Ireland Ltd have recently supplied pre-stressed YE8 bridge edge beams for the ongoing works at Heathrow Airport.
