| Have you ever wished there was a safe alternative to
insitu concrete bedding?
At last there is a safe solution to the problem of every high
loads on concrete pipelines.
Macrete Super H Pipes are a combination of reinforced and
prestressed pipe technology resulting in pipes of normal weight and
up to four times class H strength.
The super H pipes give the engineer a product which helps solve
the problem of:
- High fill loads
- Heavy wheel and machine loads
- Loads from stock piles of materials
The normal solution to there problems has been to use Class H
Pipes with concrete cradles or arches. The engineer can now specify
Super H Pipes with normal granular bedding for an equivalent or
greater load bearing capacity.
The advantages on site are many and include:
1. Elimination of site concrete.
2. Minimal supervision, as bedding requirements are to a
much less stringent specification.
3. The pipes have proven factory tested strengths to much
more stringent requirements than reinforced pipes.
4. The pipe can be joined to standard class L, M or H
pipes of same diameter. - no need for manholes at changeover
point.
5. The pipe can be laid with the same cranage as L, M or H
pipes.
For assistance in the design of extra high load pipelines
contact Macrete Pipe Division. Details of pipes can be provided when
exact requirements are known. Numerous references are
available. |